• Project Name: IDB Lab Conversion
  • Client: Wise Construction
  • Location: 1 Design Center Pl, Boston, MA 02210
  • Year Completed: 2022
  • Value: 2,225,000.00
Cavalieri was tasked with the following for this project:
  • Relocation of existing 16″ water main., including laterals and temporary bypass. The water line relocation was performed in a manner to maintain service to the active cruise terminal, numerous food processing facilities, and One Design Center.
  • Instillation of electrical duck banks including vaults, conduit with concrete encasement, formwork, as well as placement of concrete transformer and switch gear pads.
  • Excavation and cofferdam SOE for the installation of a 20,000-gallon underground fuel tank
  • installation of new sewer services and structures
  • Interior plumbing excavation which involved tunneling and shoring under the existing building structural slab on grade
  • Vehicle and pedestrian control to maintain an active cruise port during construction
  • roadway and sidewalk restoration
This project was completed safely and on schedule with the efforts of our team and subcontractor team.